Pontoon access gangways
Fabricated assemblies between a fixed landing and floating pontoon, with movement and connection details taken from the site design.
Custom fabrication · Marine
Marine gangways
Connect a fixed landing to a pontoon or jetty with a gangway fabricated for the site’s access design. We build the metal frame, deck supports, rails and specified connections around the span, loading and movement the completed crossing must accommodate.
Get a quote for your projectOr call Matt 021 2555 443
02 / Price & scope
Planning estimates in NZD, excluding GST. Length, width, loading, material, decking, rails and moving interfaces determine the final quote.
Discuss your quote with MattSupply-only fabrication estimate for a short pedestrian gangway with frame, agreed metal deck and rails. The span, loading and connections are specified before a fixed quote.
$6,500from, + GST per gangway assembly
Estimated $6,500–$25,000 + GST per gangway assembly
Engineering, testing, consent and survey work, pontoons, foundations, proprietary connection hardware, freight, lifting and installation are separate unless itemised. Long-span and major commercial systems are quoted individually.
04 / The practical details
Yes. Matt has extensive experience with rated and compliance-related fabrication. Send the drawings, materials, loads and documentation requirements so the fabrication and verification scope can be agreed.
The site design establishes the movement range and the hinge, roller or guide arrangement. We fabricate the frame and interfaces to those details, coordinating the deck transitions and clearances with the designer.
Yes. Include the loaded equipment weight, wheel contact, turning space and required clear width in the brief. Those details are considered with the pedestrian use, deck surface and complete support design.
Yes, a new gangway can be made around suitable existing structures. Send the current connections, support details and site movement information so Matt can coordinate the replacement and any interface alterations.
How it works
We confirm size, materials, the loadings or spec and how it will be used.
It is all priced before any steel is cut, so there are no surprises.
Built in the Patumahoe workshop to the agreed spec.
Collection, delivery and any installation are arranged as agreed in your quote.
Let’s make it fit
Send the access drawings, span, required clear width and levels at both ends. Include water-level and pontoon movement information, intended users and loads, connection details, exposure and the route for delivery and lifting.